| launched: | 1997 |
| shipyard: | INCAT - Hobart, Tasmania, Australia |
| completed: | 7th June 1997 |
| length: | 86.82m |
| beam: | 26.0m |
| max draft: | 3.50m |
| gross tonnage: | 5,007 tons |
| service speed: | 41 knots |
| power: | 28,320 KW |
| engines: | 4 x Ruston 20RK270 marine diesel engines |
| water jets: | 4x Lips LJ145D water jets configured for steering |
| passenger capacity: | 800 |
| garage capacity: | 200 cars at 4.5m length x 2.3m wide |
| ride control: | A 'Maritime Dynamics' active ride control system |